Clean Tech

Renewable Energy
Green Building
Waste and Recycling

The VQC CleanTech team provides Total Quality Solutions (TQS) and provides customer service by using advanced measuring devices and software that enable analyzing systems and evaluating final configurations.

QA/QC process involvement for cleantech projects includes:

  • Quality Plan Preparation (QAP)
Writing a quality plan that meets the quality requirements of our client’s specification and the national electrical code.
  • Design Review
Review of the design plans from a qualitative point of view.
Survey of plans and drawings prior to installation while illuminating concerning issues.
  • Incoming Materials Inspection
Inspect and bunch checking of all material supplies before arrival on site and during installation.
Verification that the material meets the relevant codes and standards.
Verify Materials meet the drawings and details.
  • Software Evaluation
Running the project configurations and to evaluating its results.)Photovoltaic projects).
  • System PR
Estimate the project PR before installation and view result report about system future functioning. (Photovoltaic projects).
  • Source Inspection
Inspect equipment before installation at manufacturer's workshop and assure suitability to design and relevant codes and standards.
Storage, handling and manufacturing conditions of the upcoming materials in the manufacturer facility and verification that all required conditions of manufacturing are maintained to achieve the highest quality performance of the material to be used.
  • Establishment of Site Work Procedure
Writing and enforcing quality procedures before and during installation, as well as for final verification.
  • Contractors Orientation and Training
Insuring all workers at site are certified and licensed by work grade.
  • Installation Inspection
Escorting the project during installation and identifying quality issues in “real time”.
Insure installation complies with national electrical code and laws.
Insure installation compatible with all projects specs and relevant standards.
Inspect and insure all installation is compliant with planning and drawings.
Insure alterations to plans are executed under control.
  • Design Verification
Interface with designer/engineer to ensure all installations are compliant with the plans.
  • Certified Test
Provide accredited test for all facilities at any current and power size.
  • System Handover
QC final, DV and OAT of all construction items.
Final documentation and engineering report.