Semiconductor
VQC is involved at all levels of the semi-conductor project execution, starting from the initial stages of the design review to the final testing and handover of completed facilities.
VQC Quality involvement for High Purity systems includes:
- Quality Plan Preparation (QAP)
- Writing a quality plan that meets the quality requirements of the customer specification and /or local code regulation.
- Incoming Materials inspection
- Including chemical composition and compliance of the material to its use.
- Verification that the material meets the relevant codes and standards.
- Materials meets the drawings and details.
- Source inspection
- Storage, handling and manufacturing conditions of the upcoming materials in the manufacturer facility and verification that all required conditions of manufacturing are maintained to achieve the highest quality performance of the material to be used.
- Establishment of site work procedure
- Writing and enforcing quality procedures before and during installation, as well as for final verification.
- Design review
- Review of the design plans from a qualitative point of view.
- Contractors orientation and training.
- Orbital welders qualification.
- PVC/CPVC bonders qualification.
- IR fusion operators for PVDF, PP, PFA, HDPE.
- Brazing and soldering of copper piping.
- Installation inspection
- Escorting the project during installation and identifying quality issues “real time”.
- Welding inspection
- Welds inspection according to the relevant codes and specifications.
- Pressure and hydrostatic test
- Engineering calculation of required pressure.
- Verified compliance to our customer requirements and needs.
- “Trouble shooting”.
- Analytical testing and certification
- Humidity test
- Oxygen test
- Particle count
- Helium leak test
- System handover
- QC final, Design Verification, Operation Acceptance Test and Final Acceptance Test of all construction items.
- Safety Level 1 and Safety Level 2 for tool installation.
- Final documentation and engineering report.